Decide what can’t go dark, then power it
Backup power starts with a list: which loads must run during an outage, and for how long. That list sizes the generator and the transfer switches.
What we install and service
- Standby generators sized to your critical loads
- Automatic transfer switches
- Critical-load panels that separate must-run circuits
- Connections for portable generators
- Scheduled exercise and maintenance
Keep it ready to start
For systems covered by NFPA 110, the standard for emergency and standby power systems, generators are exercised under load at least monthly for at least 30 minutes. We can run that schedule for you and log every test.
Sources: Minnesota Department of Health, generator testing under NFPA 110; Generator Source, NFPA 110 requirements.
Before you buy a generator
Do we need to back up the whole building?
Usually not. Backing up only the critical loads can mean a smaller generator and a lower price.
Who keeps it maintained?
We can put the generator on a service agreement with scheduled exercise and inspections.
Size your backup power
Tell us what has to stay on during an outage. We’ll size the generator and transfer equipment.