Electrical that keeps pace with the build
On new construction, the electrician touches every phase. We plan our crew around your schedule so rough-in is ready when the framers finish and trim-out is ready when the finishes go in.
What we build
- Retail pads and strip centers
- Office and flex buildings
- Shell spaces ready for future tenant improvements
- Restaurants and quick-service buildings
- Light industrial and warehouse buildings
From groundbreaking to closeout
- Temporary power. Power for the site and the job trailers.
- Underground and service. Coordinated with the utility.
- Rough-in. Feeders, branch circuits and low-voltage pathways.
- Trim-out. Fixtures, devices and equipment connections.
- Inspections and closeout. As-builts, panel schedules, permits and a warranty letter.
Before you award
How do you handle long-lead equipment?
We list lead times for switchgear, panels and fixtures in the bid and order as soon as submittals are approved.
Can you hold our schedule?
Before award, we confirm the crew size and dates we can commit to. If we can’t hold your schedule, the bid says so.
Bid your next building
Send the drawing set or plan-room link with your bid date.