Skip to content

Utah Master License #311899-5502. Serving Utah, Idaho, Wyoming and the Intermountain Region.

24/7 emergency: 801-455-7217

Tenant Improvement Electrical Contractor in Utah and the Intermountain West

Office, retail, restaurant and medical build-outs wired to plan, inspected and closed out on your schedule, so the tenant can open on time.

Panel scheduleBrian Young Electric
  1. Master License #311899-5502
  2. Electrical License #12472933-5501
  3. General Contractor License #311899-B100 Verify on the state lookup
  4. 34 years in the field, including 6 years as an electrical instructor
  5. Itemized bids in 24 hours
  6. 1-year warranty on labor and materials
  7. 24/7 emergency service

Open the space on the date in the lease

A tenant improvement is a deadline with a rent date attached. We bid it line by line, staff it to your schedule and hand over closeout documents with the final invoice.

Tenant improvements we wire

  • Office suites, open-plan fit-outs and conference rooms
  • Retail storefronts, display lighting and sign power
  • Restaurants, including kitchen equipment circuits and hood interlocks
  • Medical and dental suites with dedicated equipment circuits
  • Second-generation refreshes and new demising walls

What’s included

Demo and make-safe, rough-in, panels and feeders, lighting and controls, equipment connections, low-voltage pathways, permits, city inspections, punch list, and a closeout package with as-builts and updated panel schedules.

If you’re the general contractor

  • Itemized bids with inclusions, exclusions and alternates
  • Crew sizes that match your schedule, confirmed before award
  • Questions on the drawings sent to you early, in writing
  • Submittals and closeout documents delivered without chasing

Read how we work with general contractors

If you’re the tenant or landlord

No GC on the job? We coordinate with the landlord’s building rules, the architect or engineer and the city, and give you one price for the electrical scope.

Before you hire us

The building is occupied. Can you work around the other tenants?

Yes. Shutdowns and noisy work happen after hours, scheduled with building management in writing.

Our drawings aren’t final. Can you still price it?

Yes. We price the current set, list the assumptions, and reprice the changes when the next revision lands.

Who pulls the permit?

We pull the electrical permit and schedule the electrical inspections.

Get an itemized tenant improvement bid

Send the drawing set or a plan-room link. Inclusions, exclusions and alternates come back in writing.

Tenant improvement questions

Do you work from architect drawings or design-build?

Both. If there are no electrical drawings, we lay out the system and run load calculations, and bring in a licensed engineer when the city requires stamped drawings.

Can you work nights while the building is occupied?

Yes. We agree on the schedule with building management in writing before work starts.

Do you provide closeout documents and as-builts?

Yes. Every tenant improvement closes with as-builts, updated panel schedules, the signed-off permit and a warranty letter.

Can you work with my landlord’s required vendor list?

Send us the landlord’s contractor requirements. We’ll tell you before bidding whether we meet them.