Skip to content

Utah Master License #311899-5502. Serving Utah, Idaho, Wyoming and the Intermountain Region.

24/7 emergency: 801-455-7217

Commercial Electrical Questions, Answered

Short answers to the questions property managers, general contractors and owners ask before they hire an electrician.

Panel scheduleBrian Young Electric
  1. Master License #311899-5502
  2. Electrical License #12472933-5501
  3. General Contractor License #311899-B100 Verify on the state lookup
  4. 34 years in the field, including 6 years as an electrical instructor
  5. Itemized bids in 24 hours
  6. 1-year warranty on labor and materials
  7. 24/7 emergency service

Bidding and scheduling

How fast can you turn around a bid?

Tell us your bid due date when you send plans, and we’ll confirm whether we can meet it.

Complete plans get an itemized bid within 24 hours.

What should I send for a bid?

Plans and specs with the electrical sheets, addenda, the bid date and the target start date. For remodels, add photos of the existing panel and service.

Can you work nights and weekends?

Yes. In occupied buildings, we schedule shutdowns and noisy work after hours and agree on the plan with you in writing first.

Licensing, insurance and safety

Are you licensed in Utah?

Yes. Utah requires a license from the Division of Professional Licensing (DOPL) for electrical work done for pay, and you can verify any license on the state’s lookup at secure.utah.gov.

What are your license numbers?

Master License 311899-5502, Electrical License 12472933-5501 and General Contractor License 311899-B100. Check them on Utah’s license lookup.

Can you add us as additional insured?

Send your insurance requirements with the bid request. We’ll send a certificate of insurance that meets them, or tell you up front if we can’t.

Projects and equipment

Do you work from architect drawings or design the system?

Both. On design-build jobs we lay out the system and run the load calculations. When the city requires stamped drawings, a licensed electrical engineer prepares them.

How long does a service upgrade take?

The install itself is usually short. The utility’s schedule for disconnecting and reconnecting service often sets the timeline, so we request it as soon as the job is awarded.

How is an EV charger circuit sized?

The National Electrical Code treats EV charging equipment as a continuous load, so overcurrent protection must be at least 125% of the charger’s rating. A 40-amp charger needs at least a 50-amp breaker.

How often should electrical equipment get a thermal scan?

The 2023 edition of NFPA 70B calls for infrared inspection of electrical equipment at least every 12 months, and every 6 months for equipment in poor condition.

How often should a standby generator be exercised?

For systems covered by NFPA 110, the standard calls for exercising the generator under load at least monthly for at least 30 minutes.

Emergencies

What counts as an electrical emergency?

A burning smell, smoke, sparks, a hot panel, water near electrical equipment, or a power loss that stops your business. If you see smoke or flames, leave and call 911 first.

Do you offer 24/7 service?

Yes, for commercial properties, day or night. Call 801-455-7217.

Sources: NEC Article 625 (Mike Holt Enterprises; EC&M). NFPA 70B (TÜV SÜD; Infrared Training Center). NFPA 110 (Minnesota Department of Health; Generator Source). Utah licensing (Utah DOPL; Housecall Pro).

Still have a question?

Call us or send a request. We answer in plain language.